| № |
The name |
Unit of measure |
The price in rubles
|
| 11 |
Preliminary stage of landscape designing |
|
|
1.11.1
|
Departure of the landscape designer, consultation, the recommendation, photographic materials, transport
|
In Moscow
|
1500 |
| To 60 km from MKAD |
2500
|
| To 100 km from MKAD |
4000
|
| Over 100 km |
Contractual
|
|
At the contract conclusion on designing, departure
|
To 60 km from
|
Free of charge |
| 1.2 |
Topographical photo (М1:100, М1:200) (economic, wood zones) |
1 hundred part |
700 |
| 1.3 |
Geodesic photo (AutoCAD) |
To 10 hundred parts |
1050/hundred part |
| To 25 hundred parts |
900/hundred part |
| 1.4 |
Trees valuation (on geodesic photo) |
1 tree |
90 |
| 1.5 |
Selection and the analysis of soil samples (hydrolysis) N, P, K, humus, micro cells: a pine forest, molybdenum, manganese, copper, zinc, cobalt, nickel heavy metals: cadmium, mercury, lead, zinc, arsenic, copper residual quantity of pesticides |
1 test |
From 3000 |
| 1.6 |
Draft designing (форэскизы, working out of idea, the concept)
|
To 10 hundred parts |
4500 |
| To 25 hundred parts |
360/hundred part |
| To 50 hundred parts |
300/hundred part |
| Over 50 hundred parts |
240/hundred part |
| 2 |
Territory preparation
|
|
|
2.1
|
Felling of trees (cost depends on a place of growth, the sizes of a tree and felling difficulty)
|
1 piece
|
Contractual
|
2.2
|
Rooting and removal of stubs
|
1 piece
|
Contractual
|
2.3
|
Crown design, a scrap of boughs and trees
|
1 piece
|
From 150 to 4000
|
2.4
|
Clearing of a site from small forest
|
1 sq. m
|
Contractual
|
2.5
|
Smoothing out (without earth cost)
|
1 cubic m
|
From 90
|
2.6
|
Plot formation
|
1 cubic m
|
From 210
|
2.7
|
Geoplastic (creation of an artificial relief)
|
1 cubic m
|
From 100
|
2.8
|
Processing of a plot from weeds:
|
|
|
Chemical method
|
1 hundred part
|
From 1000
|
Mechanical method
|
1 hundred part
|
From 40
|
3
|
Designing
|
|
|
3.1
|
The general plan on the basis of the confirmed sketch (there are shown the basic functional zones, paths, platforms, groups of trees and bushes, flower beds, small architectural forms, placing of structures)
|
1 hundred part
|
300
|
3.2
|
Dendroplan on the basis of the confirmed sketch (a range list with species composition and number of plants is attached)
|
1 hundred
|
300
|
3.3
|
The marking drawing of a lay-out (a binding of the basic constructions, paths, SAF)
|
To 10 hundred parts
|
1500
|
From 10 hundred parts
|
120/hundred part
|
3.4
|
The landing drawing
|
1 sheet
|
4500
|
3.5
|
Flower bed (from annuals and perennials)
|
1 sq. m
|
150
|
3.6 |
Plot’s 3D-visualisation:
|
|
|
To 1 hectare
|
1 hundred part
|
2000
|
From 1 hectare
|
1 hundred part
|
800
|
From 3 hectares
|
1 hundred part
|
500
|
3.7
|
Vertical lay-out
|
1 hundred part
|
600
|
3.8
|
Cartogram of earthen weight
|
1 hundred part
|
900
|
4
|
The additional designing documentation
|
|
|
4.1
|
The illumination plan (the basic scheme of lighting devices, selection of fixtures, a designation of illumination lines)
|
To 25 hundred parts
|
3000
|
above
|
+60/hundred part
|
4.2
|
Auto watering system (automatic, mechanical)
|
To 12 hundred parts
|
3000
|
4.3
|
The drainage and water-pipe system plan
|
To 25 hundred parts
|
3000
|
above
|
+60/hundred part
|
4.4
|
SAF project (specific points, the working documentation)
|
above
|
+60/hundred part
|
4.5
|
SAF Sketch
|
1 pieces
|
To 3000
|
4.6
|
Water elements (sketch)
|
1 pieces
|
To 6000
|
4.7
|
Paving plan
|
1 sheet
|
To 3000
|
5
|
Lawn
|
|
|
5.1
|
The lawn device: Price includes: - Removal of weed vegetation - Soil digging up; - Micro-planning; - Delivery of a fertile ground; - Crops of seeds; - Mulching; - Rolling up; - The first cutting
|
1 sq. m
|
From 120 to 580 (depending on a thickness of a layer of a filled ground, structure, a plot total area etc.)
|
5.2
|
Care of a lawn
|
|
|
Aeration (perforation)
|
sq.м
|
30
|
Combing out
|
sq.м
|
15
|
Early-spring cultivation of land
|
Hundred part
|
From 300
|
Sowing with mulching (only work)
|
sq.м
|
30
|
Fattening (complex fertilizing)
|
Hundred part
|
300
|
Cutting (without export of the vegetative rests)
|
Hundred part
|
From 240
|
Struggle against weeds
|
Hundred part
|
From 750
|
Cleaning and dust export
|
sq.м
|
1200
|
Autumn removal of foliage (without export)
|
Hundred part
|
From 210
|
Lawn cutting
|
100 sq.м
|
240
|
6
|
Beds and flower beds
|
|
|
6.1
|
The device of beds and flower beds: - - From the annual; - From the perennial; - From the bulbous; - Rosarium
|
1 sq. m
|
From 2300 From 3800 From 2500 From 3200
|
6.2
|
Care of flower beds
|
|
|
Covering, recovering
|
Piece
|
The contractual
|
Flattering with making friable
|
sq.м
|
45
|
Rejuvenation (dell-fission) of perennials
|
Piece
|
45
|
Planting of the dropped out plants
|
Piece
|
The contractual
|
Weeding of weeds (removal of faded plants)
|
sq.м
|
From 45
|
Chemical cultivation from illnesses and pests
|
sq.м
|
From 30
|
7
|
TREES
|
|
|
7.1
|
Planting of trees (with a 1-2 years guarantee ) The list of works and materials included in landing works with a guarantee: Works: - Preparation of seats; - Loading-unloading and delivery of plants; - Landing works; - Installation of fixing adaptations; - by stimulators, if necessary, medical preparations and application of fertilizers (during the spring-autumn period); - Supervision over a condition of green plantings; Materials: - At necessity, a fertile ground; - Stimulators, fertilizers and, at necessity, medical preparations; - covering materials for some coniferous trees and bushes; - Fixing adaptations
|
-
|
30-50 % from cost of materials
|
7.1 |
Care of trees
|
|
|
Covering, recovering
|
Piece
|
From 150
|
Scrap (fruit) (without export of the vegetative rests)
|
Piece
|
From 150 to 4500
|
Crown formation
|
Piece
|
The contractual
|
Removal of trees, stubs stubbing
|
Piece
|
The contractual |
Loosing a trunk of circle, removal of weeds
|
sq.м
|
45
|
Fattening
|
sq.м
|
From 15
|
Chemical cultivation from illnesses and pests to 6 m
|
Piece
|
From 60 to 600
|
Chemical cultivation from illnesses and pests from 6 m
|
Piece
|
The contractual
|
Cultivation by growth factors to 6 m
|
Piece
|
135-600
|
Cultivation by growth factors from 6 m
|
Piece
|
The contractual
|
8
|
BUSHES
|
|
|
8.1
|
Bush landing
|
|
|
Single-row green hedge
|
Item m.
|
From 300
|
Double-row green hedge
|
Item m.
|
From 540
|
Individual decorative bush
|
Piece
|
From 150
|
Fruit-bush
|
Piece
|
From 150
|
8.2
|
Care of a bush
|
|
|
Covering
|
Piece
|
From 60
|
Uncovering
|
Piece
|
From 30
|
Cutting
|
Piece
|
From 60 до 1500
|
Flattering with making friable
|
sq.м
|
45
|
Crown formation
|
Piece
|
договорная
|
Weeding under plants
|
sq.м
|
From 15
|
Chemical cultivation
|
Piece
|
From 30
|
Chemical cultivation by growth factors
|
Piece
|
From 45
|
Cutting in a fence (without export of the vegetative rests)
|
Item m
|
From 60
|
9
|
The device of illumination system
|
-
|
According to the project
|
10
|
The device of drainage
|
1 m. of the item
|
From 300
|
11
|
Watering system device
|
100 sq.м
|
From 6000
|
12
|
Paving paths - From gravel, granite elimination; - From pavement tiles, a brick; - From a natural stone; - From a granite stone blocks; - From a tile (a granite, marble, etc.)
|
1 sq.м
|
From 180 от 360 From 360 From 1200 From 1200
|
13
|
The device of retaining walls (to 0,8 m in height)
|
1 sq.м
|
2100-3000 (depending on a stone)
|
14
|
Installation pavement stone
|
1 m. of the item
|
From 180
|
15
|
Installation of fences
|
-
|
According to the project
|
16
|
Cleaning of territory with dust export
|
7 cubic m
|
From 2700
|
17
|
Building of arbours, children's playgrounds and small architectural forms
|
-
|
According to the project (FEASIBILITY REPORT)
|
18
|
Reservoirs
|
1 sq.м
|
From 6000
|
19
|
The device of small fountains, reservoirs
|
1 Pieces
|
From 7500
|
20
|
The device of rock gardens, rosaries
|
1 sq.м
|
From 5600 (without material cost)
|
21
|
Processing of a site from weeds: - In the chemical way; - Manually
|
100 sq.м
|
From 300 от 1200
|
22
|
Grounds (with delivery)
|
-
|
According to the arrangement
|